Search: Bps

Sort by: Relevance Date
1120 of 44 search results for Bps

RBA Glossary definition for Bps

Bps – Basis points. A basis point is 1/100th of 1 per cent or 0.01 per cent. The term is used in money and securities markets to define differences in interest or yield.

Search Results

Table 6 in Business Cycle Dynamics in OECD Countries: Evidence, Causes and Policy Implications | Conference – 2005

11 Jul 2005 Conferences
Gap based on trend GDP as calculated with BP filter (6,32), K=12.
https://www.rba.gov.au/publications/confs/2005/cotis-coppel-table-6.html

References

11 Sep 2015 RDP 2015-03
Tai Lam and Crystal Ossolinski
Kling CL, DJ Phaneuf and J Zhao (2012), ‘From Exxon to BP: Has Some Number Become Better than No Number?’,.
https://www.rba.gov.au/publications/rdp/2015/2015-03/references.html
See 3 more results from "RDP 2015-03"

References

31 Dec 2011 RDP 2011-07
Jonathan Kearns and Philip Lowe
BP (2010), ‘Statistical Review of World Energy 2010’. Available at <http://www.bp.com/liveassets/bp_internet/globalbp/globalbp_uk_english/reports_and_publications/
https://www.rba.gov.au/publications/rdp/2011/2011-07/references.html
See 1 more results from "RDP 2011-07"

Appendix B: Estimation of Demand Elasticity

15 May 2024 RDP 2024-03
Chris Becker, Anny Francis, Calebe de Roure and Brendan Wilson
Mean cut-off rate as a spread to OIS. (bps). Mean quantity supplied Q.
https://www.rba.gov.au/publications/rdp/2024/2024-03/appendix-b.html
See 2 more results from "RDP 2024-03"

A Simple Variant of the Solution Algorithm

31 Dec 2013 RDP 2013-11
Mariano Kulish and Adrian Pagan
where Z. t. = z. t. Pz. t. 1. , S = (I BP). ... 1. B, Q = (I BP). 1. T and P is chosen such that (ABP.
https://www.rba.gov.au/publications/rdp/2013/2013-11/simple-variant-solution-algorithm.html

On the Economics of Committed Liquidity Facilities | Conference – 2013

19 Aug 2013 Conferences
Morten L Bech and Todd Keister
Pricing. Policy corridor. 25 bps. 100 bps. Up-front fee. fixed (15 bps). ... scaled (15–45 bps). Drawdown rate. = o/n lending facility rate. = o/n lending facility rate.
https://www.rba.gov.au/publications/confs/2013/bech-keister.html

Results

31 Dec 2005 RDP 2005-07
Christian Gillitzer, Jonathan Kearns and Anthony Richards
0.83. 0.93. 0.84. 0.92. 0.61. SW (BP q=2). 1. 0.87. 0.94.
https://www.rba.gov.au/publications/rdp/2005/2005-07/results.html

Appendix 1: Data

1 Dec 1992 RDP 9216
Philip Lowe and Geoffrey Shuetrim
Hunter Douglas Australia Ltd. BP Australia Ltd. ICI Australia Ltd. Brick & Pipe Industries Ltd.
https://www.rba.gov.au/publications/rdp/1992/9216/appendix-1.html

References

11 Jun 2008 RDP 2008-03
Mariano Kulish and Daniel Rees
Bernanke BS, VR Reinhart and BP Sack (2004), ‘Monetary Policy Alternatives at the Zero Bound: An Empirical Assessment’, Brookings Papers on Economic Activity, 2, pp 1–78.
https://www.rba.gov.au/publications/rdp/2008/2008-03/references.html

Australia's Prosperous 2000s: Housing and the Mining Boom | Conference – 2011

24 Jul 2000 Conferences
Jonathan Kearns and Philip Lowe
RBA Annual Conference – 2011 Australia's Prosperous 2000s: Housing and the Mining Boom Jonathan Kearns and Philip Lowe. At the start of the 2000s Australia was derided by some for being an ‘old economy’. It lacked a substantial information and
https://www.rba.gov.au/publications/confs/2011/kearns-lowe.html